Answers To Frequently Asked Questions About Pueblo County Building Permits

By Stephen Reed


The municipal building department within your area is responsible for enforcing the local building codes. The body, therefore, carries out the duty of issuing building permits before a property owner is allowed to erect a new structure or demolish, renovate or alter an existing one. By applying for Pueblo County building permits, the municipality is able to ensure that the best interests of property owners and the community as a whole are protected.

Before your application for a permit is approved, it will first get reviewed and the municipality will evaluate the work that needs to be done and whether it complies with the local codes. Building codes are used to set the standards for the construction and design of buildings within a specific area. Ideally, all constructions must meet specified zoning bylaws, resource conservation, accessibility, safety, health and fire protection objectives.

Even if you legally own a specific lot, there are developments you cannot do without first getting a permit. This very important document has to be obtained before you put a mobile structure on your property or construct one that exceeds ten square feet. You also need to get a permit before constructing seasonal buildings, excavating, renovating, extending, repairing or altering the use of an existing structure. If you want to install, repair, extend, or alter an on-site sewer system, you are also required to first obtain a permit.

As a property owner, you may want to have a good understanding of the process of applying for a permit. Well, the relevant application can be sourced from the website of the Ministry of Municipal Affairs or you can go directly to the municipality offices. You will need to provide an attachment of your plans, drawings and other documents allied with the developments you wish to make.

If your application is seen to adhere to the zoning bylaws and building codes in your area, it will be forwarded to various other municipal officials for in-depth reviewing. The permits for trivial building additions and changes normally get approved quickly and easily. More intricate proposals may however take longer to get approved.

Within 10-30 days, you will either get your application approved or refused. Any concerns that may have led to the rejection of an application will come to your attention and once the indicated concerns are corrected, you can reapply. On the other hand, applications rejected because of technical requirements such as the local building codes or bylaws must first be forwarded to court for reviewing.

Developments ought to be inspected by the municipality even after you have received your permit. Ideally, there are inspections that ought to take place during various stages of your project. This again allows the municipality to confirm that your undertakings meet the terms of your approved plans and permits as well as the relevant local codes.

Getting building permits is not easy. This is more so the case if you are making an application for the first time and you have no idea about what the process entails. To make it easier for you to get the much needed document, you may want to work with qualified and proficient contractors.